Slab lifting and soil stabilization

Logistics centre, Lithuania

ADCOS’ long-term partner for the Baltic region used GEORESINS to stabilize eroded soil, thus lifting and levelling the sunk slab.

Carlsberg group was facing a deformed concrete slab in their logistics center in Lithuania because of soil erosion beneath the concrete slab. The objective in this project was dual: Firstly to stabilize the existing soil and fill up all cavities in order to prevent future deformations, making sure it is a permanent solution. Secondly, the deformed slab needed to be lifted and leveled again.

ADCOS’ internally developped GEORESIN 055 was used to stabilize the soil, fill the cavities and lift the slab with 19 mm. The applicator managed to fix the problem for the client in only 5 working nights. This very efficient solution, together with the fact that the applicator was able to work during the night when the logistics center worked at minimal capacity, was one of the main advantages for the Carlsberg group to choose the proposal. With this injection method, there was no need to move the automated racks and working capacity was kept as high as possible.

Products Used

We’re eager to help you

Let’s get in touch!